Materials and Tools used
Working Procedure
Excavation levels and dimensions to be checked as per drawings. Remove all the loose earth from the pits. Do water sprinkling and ramming the cleaned surface of pit by mechanical rammer. Do the shuttering by planks and runners wherever if necessary. Mix the concrete with required proportion and water cement ratio by mechanical mixer machine and place the same in to pits. Poured surface to be rammed and finished smoothly
- Auto level instrument – 1 Nos
- Wooden /Steel rammer – 1 Nos
- Mixer machine – 1 Nos
- Verifying levels and dimension
- Ramming the earth surface
- Placing the concrete.
- Ramming and finishing the concrete surface
Working Procedure
Excavation levels and dimensions to be checked as per drawings. Remove all the loose earth from the pits. Do water sprinkling and ramming the cleaned surface of pit by mechanical rammer. Do the shuttering by planks and runners wherever if necessary. Mix the concrete with required proportion and water cement ratio by mechanical mixer machine and place the same in to pits. Poured surface to be rammed and finished smoothly
Comments
Post a Comment